Why User Stories Rarely Work

All tools are useful when used appropriately, and User stories are no different.

User stories are fantastic when used in small teams on small projects where the team is co-located and has easy access to customers.

User stories can quickly fall apart under any of the following situations:

  • the team is not small
  • the project is not small
  • the team is not in a single location
  • customers can be accessed in a timely fashion
  • project end date must be computed

AgileManifestoIndividualsUser stories were introduced as a core part of Extreme Programming (XP). Extreme Programming assumes that none of the above are happening; relax any of these constraints and you can end up with a process out of control.  XP, and hence user stories, works in high intensity environments where there are strong feedback loops.

User stories need intense communication 

User stories are a light-weight methodology that facilitates intense interactions between customers and developers and put the emphasis on the creation of code, not documentation.  Their simplicity makes it easy for customers to help write them, but they must be complemented with timely interactions so that issues can be clarified.

Large teams make intense interactions between each pair of developers difficult; intense interactions keep everyone on the same page.  Most organizations break teams into smaller groups where communication is through email or managers — this kills communication and interaction.

Larger projects have non-trivial architectures.  Building non-trivial architecture by only looking at the end user requirements is impossible. This is like only having all the leaves of a tree and thinking you can figure out all the branches and the trunk must be, good luck.

User stories don’t work with teams where intense interaction is not possible.  Teams distributed over multiple locations or time zones do not allow intense interaction.  You are delusional if you think regular conference calls constitute intense interaction.

When emphasis is on the writing of code then it is critical that customers can be accessed in a timely fashion.  If your customers are indirectly accessible through product managers or account representatives every few days then you will end up with tremendous latency.

 

Live weekly demos with customers are necessary to flush out misunderstandings quickly and keep you on the same page

User stories are virtually impossible to estimate. Often, we use user stories because there is a high degree of requirements uncertainty either because the requirements are unknown or it is difficult to get consistent requirements from customers.

Since user stories are difficult to estimate, especially since you don’t know all the requirements, project end dates are impossible to predict with accuracy.

To summarize, intense interactions between customers and developers are critical for user stories to be effective because this does several things:

  • it keeps all the customers and developers on the same page
  • it flushes out misunderstandings as quickly as possible

Diluted

All of the issues listed initially dilute the intensity of communication either between the team members or the developers and customers.  Each issue that increases latency of communication will increase misunderstandings and increase the time it takes to find and remove defects.

So if you have any of the following:

  • Large or distributed teams
  • Project with non-trivial architecture
  • Difficult access to customers
  • Projects in new domains
  • Projects where knowing the end-date is necessary
Then user stories are probably not your best choice of requirements methodology.  At best you may be able to complement your user stories with storyboards, at worst you may need some form of use case.
Other requirements articles:
VN:F [1.9.22_1171]
Rating: 5.0/5 (1 vote cast)
VN:F [1.9.22_1171]
Rating: +1 (from 1 vote)

Seriously. The Devil Made me do It!

good vs evilJust as eternal as the cosmic struggle between good and evil is the challenge between our two natures. Religion aside, we have two natures, the part of us that:

  • thinks things through; make good or ethical decisions a.k.a. our angelic nature
  • react immediately; make quick but often wrong decisions a.k.a. our devil nature

Guess God left a bug in our brains so that it emphasizes fast decisions over good / ethical decisions.

Quite often we make sub-optimal or ethically ambiguous decisions under pressure

You decide…


SteamingPileSituation: Your manager comes to you and says that something urgent needs to be fixed right away. Turns out the steaming pile of @#$%$ that you inherited from Bob is malfunctioning again.

Of course Bob created the mess and then conveniently left the company; in fact, the code is so bad that the work-arounds have work-arounds.

Bite the bullet, start re-factoring the program when things goes wrong.  It will take more time up front, but over time the program will become stable.

Find another fast workaround and defer the problem to the future.  Find a good reason why the junior member of the team should inherit this problem.


MultiplePathsSituation: You’ve got a challenging section of code to write and not much time to write it.

Get away from the computer, think things through.  Get input from your peers, maybe they have seen this problem before. Then plan the pathways out and write the code once cleanly. Taking time to plan seems counter intuitive, but it will save time.

Naw, just sit at the keyboard and bang it out already.  How difficult can it be?


BlameSituation: The project is late and you know that your piece is behind schedule.  However, you also know that several other pieces are late as well.

Admit that you are late and that the project can’t finish by the deadline.  Give the project manager and senior managers a chance to make a course correction.

Say that you are on schedule but you are not sure that other people (be vague here) will have their pieces ready on time and it could cause you to become late.


Measurement, smallSituation: You have been asked to estimate how long a critical project will take.  You are only been given a short time to come up with the estimate.

Tell the project manager that getting a proper estimate takes longer than a few hours. Without proper estimates the project is likely to be severely underestimated and this will come back to bite you and the project manager in the @$$.

Tell the project manager exactly the date that senior management wants the project to be finished by.  You know this is what they want to hear, why deal with the problem now? This will become the project manager’s problem when the project is late.


The statistics show that we often don’t listen to our better (angelic?) natures very often. So when push comes to shove and you have to make a sub-optimal or less than ethical decision, just remember:

The devil made you do it!

Run into other common situations, email me

VN:F [1.9.22_1171]
Rating: 0.0/5 (0 votes cast)
VN:F [1.9.22_1171]
Rating: +1 (from 1 vote)

Project failed? You get what you deserve!

3 of 10 software projects fail, 3 succeed, and 4 are ‘challenged’1.  When projects fail because you cut corners and exceed your capabilities then — you get what you deserve.  You don’t deserve pity when you do it to yourself.

We estimate that between $3 trillion and $6 trillion dollars are wasted every year in IT.  Most of this is wasted by organizations that are unskilled and unaware that they are ignorant.

Warning this article is long!

However, there are organizations that succeed regularly because they understand development, implement best practices, and avoid worst practices (see Understanding Your Chances).

In fact, McKinsey and Company in 2012 stated:

A study of 5,400 large scale IT projects  finds that the well known problems with IT Project Management are persisting. Among the key findings quoted from the report:

    • 17 percent of large IT projects go so badly that they can threaten the very existence of the company
    • On average, large IT projects run 45 percent over budget and 7 percent over time, while delivering 56 percent less value than predicted

law-unintended-consequencesProjects fail consistently because organizations choose bad practices and avoid best practices and wonder why success is elusive (see Stop It! No… really stop it. to understand the common worst 5 practices)

What is amazing is that failures do not prompt the incompetent to learn why they failed.

RinseAndRepeatEven worse, after the post-fail finger pointing ceremony, people just dust themselves off and rinse and repeat.

The reality is that we have 60 years of experience in building software systems.  Pioneers like Watts Humprey, M.. E. Fagan, Capers Jones, Tom DeMarco, Ed Yourdon, and institutions like the Software Engineering Institute (SEI)  have demonstrated that software complexity can be tamed and that projects can be successful2.

The worst developers are not even aware that there is clear evidence about what works or what doesn’t in software projects.  Of course, let’s not let the evidence get in the way of their opinions.

IngredientsIngredients of a Successful Project

Successful software projects generally have all the following characteristics:

  • Proper business case justification and good capital budgeting
  • Very good core requirements for primary functionality
  • Effective sizing techniques used before executing the project
  • Appropriate project management to the size of the project and to the philosophy of the organization
  • Properly trained personnel
  • Focus on pre-test defect removal

MissingPiecesEvery missing characteristic reduces your chance of success by an order of magnitude.  If you know that one or more of these characteristics are missing then you get what you deserve!

Missing some of these elements doesn’t guarantee failure, but it severely decreases your chance at success.

Let’s go through these elements in order.

This article is very long, so this is a good place to bail if you don’t have time.

Proper Business Case

IfYouBuildItThis is the step that many failed projects skip over, the hard work behind determining if a project is viable or not.

Organizations take the Field of Dreams approach, i.e. “If you build it, they will come...” and skip this step due to ignorance, often resulting from executives who do not understand software (see No Business Case == Project Failure). These are executives that do not have experience with software projects and assume that their force of personality can will software projects to success.

Some organizations claim to build business cases, but these documents are worthless.  I even know of public companies that write the business case AFTER the project has started, simply to satisfy Sarbanes-Oxley requirements.

A proper business case attempts to quantify the requirements and technical uncertainty of a software project.  It does due diligence into what problem is being solved and who it is solving the problem for.  It at least verifies with a little effort that the cash flows resulting from the project will be NPV positive.

Business cases are generally difficult to write because they involve getting partial information.  This can be very difficult if your analysts are substandard (see When BA means B∪ll$#!t Artist).

Very Good Core Requirements

Skeleton Once a project has a proper business case then you need to capture the skeleton of the core requirements.  This is a phase where you determine the primary actors of the system and work out major use case names.

Why expand requirements before starting the project?

Executives have a business to run and need to know when software will be available.  If you don’t know how big your project is then you can’t create an effective project plan.  You don’t want to capture all the requirements so core requirements (i.e. a good skeleton) helps you to size the project without having to get the detailed requirements.

This is why executives like the waterfall methodology. On the surface, this methodology seems to have a predictable timeline — which is what they need to synchronize other parts of the business.  The problem is that the waterfall methodology DOES NOT WORK (see last page).

The only way for managers to get a viable estimate of a software project is to expand the business case into requirements that allow you to determine the project’s size before you start it.

Calculate House SizeThis process is just like determining the cost for a house by the square footage and the quality, i.e. 2500 sq. ft at normal quality (~$200 per sq. ft.) would be approximately $500K, even without detailed blueprints.  Very accurate estimates can be derived by sizing a project using function points.

Effective Estimation

RulersNow that you have core requirements, you can determine the size of the project and get an approximate cost.  You are fooling yourself if you think that you can size large projects without formal estimates (see Who needs formal measurement?)

Just like you can determine the approximate cost of a house if you know the square footage and the quality, you can estimate a software project pretty accurately if you know how many function points (i.e. square footage) and quality requirements of the project3.

There is so much literature available on how to effectively size projects, so do yourself a favor and look it up.  N.B. There are quite a few reliable tools for an accurate estimate of software projects, i.e. COCOMO II, SLIM, SEER-SEM.  See also Namcook Analytics,

If you don’t size a project then your project plan predicts nothing

Of course, you could always try a management declared deadline which is guaranteed to fail (see Why Senior Management Declared Deadlines lead to Disaster)

Appropriate Project Management

AgileManifestoYou must select a project methodology appropriate to the organization.  Many developers are trying to push their organizations towards Agile software development, although many developers are actually quite clueless about what Agile development is.

Agile software development needs buy-in from the top of the organization.  Agile software development will probably do very little for you if you are not doing business cases and gathering core requirements before a project.

Discover how developers who claim that they are ‘Agile’ have fooled themselves into thinking that they are doing Agile development. (see Does Agile hide Development Sins?)

Trained Personnel

IncompetenceManagement often confuses seniority with competence.  After all, if someone has been with the company for 10 years they must be competent, no?  The reality is that most people with 10 years of experience only have 1 year repeated 10 times.  They are no more skilled then someone with 1 year under their belt.

Learn why in general it may be useful to get rid of older developers that are not productive (see No Experience Required!).  Also when it comes to development, you are definitely better off with people that do not rush to write code (see Productive Developers are Smart and Lazy)

Focus on Pre-Test Defect Removal

I’ve written extensively on pre-test defect removal, see Are Debuggers Crutches? for more information.

Conclusion

It is likely that you know all these ingredients that make for a successful project, you’ve just assumed that even though all these characteristics are not present that you just can’t fail.

Quite often projects fail under the leadership of confident people who are incompetent and don’t even know that they are incompetent.  If you want to know why intelligent people often do unintelligent things see Are You are Surrounded by Idiots?  Unfortunately, You Might be the Idiot..

There probably are projects that fail out there because of circumstances out of their control (i.e. natural disasters, etc) but in most failed projects you get what you deserve!

Ingredients


Fallacy of the Waterfall Methodology

The waterfall methodology is widely attributed to Winston W. Royce.

The irony is that the paper he published actually concludes that:

In my experience, however, the simpler method (i.e. waterfall) has never worked on large software development and efforts and the costs to recover far exceeded those required to finance the five step process listed.

That is Mr. Royce said that the waterfall process would never work.  So much for the geniuses that only read the first 2 pages of the paper and then proceeded to create the “waterfall method” and cost organizations trillions of dollars in failed projects each year.

The waterfall methodology was pushed down our throats by ignorant managers that saw that the waterfall seemed to mimic factory processes.  Because this was the process they understood, they icorrectly assumed that this was the right way to develop software.

If any of these guys had bothered to read more than 2 pages from the Royce paper they would have realized that they were making a colossal blunder.

Back to article


1 Challenged means that the project goes significantly over time or budget. In my estimation, ‘challenged’ simply means politically declaring victory on a project that has really failed.

2 This applies to projects that are 10,000 function points or less. We still have problems with projects that are larger than this, but the vast majority of projects are under this threshold.

3 Quality requirements depend on how reliable the project must be. If the risk is that someone might die because of a software malfunction the quality, and therefore cost, must be much higher than if software failures only constitute an annoyance.

VN:F [1.9.22_1171]
Rating: 0.0/5 (0 votes cast)
VN:F [1.9.22_1171]
Rating: 0 (from 0 votes)

Don’t be a Slave to Your Tools

Abstract SlaveDevelopers attach quickly to tools because they are concrete and have well defined behavior.  It is easier to learn a tool than to learn good practices or methodology.

Tools only assist in solving problems, they can’t solve the problem by themselves. A developer who understands the problem can use tools to increase productivity and quality.

Poor developers don’t invest the time or effort to understand how to code properly and avoid defects.  They spend their time learning how to use tools without understanding the purpose of the tool or how to use it effectively.

To some degree, this is partially the fault of the tool vendors.  The tool vendors perceive an opportunity to make $$$$$ based on providing support for a common problems, such as:

  • defect trackers to help you manage defect tracking
  • version control systems to manage source code changes
  • tools to support Agile development (Version One, JIRA)
  • debuggers to help you find defects

There are many tools out there, but let’s just go through this list and point out where developers and organizations get challenged.  Note, all statistics below are derived from over 15,000 projects over 40 years.1

Defect Trackers

Believe it or not, some organizations still don’t have defect tracking software. I’ve run into a couple of these companies and you would not believe why…

Inadequate defect tracking methods: productivity -15%, quality -21%

So we are pretty much all in agreement that we need to have defect tracking; we all know that the ability to manage more than a handful of defects is impossible without some kind of system.

Automated defect tracking tools: productivity +18%, quality +26%

The problem is that developers fight over which is the best defect tracking system. The real problem is that almost every defect tracking system is poorly set-up, leading to poor results. Virtually every defect tracking system when configured properly will yield tremendous benefits. The most common pitfalls are:

  • Introducing irrelevant attributes into the defect lifecycle status, i.e. creation of statuses like deferred, won’t fix, or functions as designed
  • Not being able to figure out if something is fixed or not
  • Not understanding who is responsible for addressing a defect

The tool vendors are happy to continue to provide new versions of defect trackers. However, using a defect tracker effectively has more to do with how the tool is used rather than which tool is selected.

One of the most fundamental issues that organizations wrestle with is what is a defect?  A defect only exists if the code does not behave according to specifications. But what if there are no specifications or the specifications are bad?  See It’s not a bug, it’s… for more information.

Smart organizations understand that the way in which the defect tracker is used will make the biggest difference.  Discover how to get more out of you defect tracking system in Bug Tracker Hell and How to Get Out.

Another common problem is that organizations try to manage enhancements and requirements in the defect tracking system.  After all whether it is a requirement or a defect it will lead to a code change, so why not put all the information into the defect tracker?  Learn why managing requirements and enhancements in the defect tracking system is foolish in Don’t manage enhancements in the bug tracker.

Version Control Systems

Like defect tracking systems most developers have learned that version control is a necessary hygiene procedure.  If you don’t have one then you are likely to catch a pretty serious disease (and at the least convenient time)

Inadequate change control: productivity -11%, quality -16%

Virtually all developers dislike version control systems and are quite vocal about what they can’t do with their version control system.  If you are the unfortunate person who made the final decision on which version control system is used just understand that their are hordes of developers out their cursing you behind your back.

Version control is simply chapter 1 of the story.  Understanding how to chunk code effectively, integrate with continuous build technology, and making sure that the defects in the defect tracker refers to the correct version are just as important as the choice of version control system.

Tools to support Agile

Sorry Version One and JIRA, the simple truth is that using an Agile tool does not make you agile, see this.

These tools are most effective when you actually understand Agile development. Enough said.

Debuggers

I have written extensively about why debuggers are not the best tools to track down defects.  So I’ll try a different approach here.

One of the most enduring sets of ratios in software engineering has been 1:10:100.  That is, if the cost of tracking down a defect pre-test (i.e. before QA) is 1, then it will cost 10x if the defect is found by QA, and 100x if the defect is discovered in deployment by your customers.

Most debuggers are invoked when the cost function is in the 10x or 100x part of the process.  As stated before, it is not that I do not believe in debuggers — I simply believe in using pre-test defect removal strategies because they cost less and lead to higher code quality.

Pre-test defect removal strategies include:

  • Planning code, i.e. PSP
  • Test driven development, TDD
  • Design by Contract (DbC)
  • Code inspections
  • Pair programming for complex sections of code

You can find more information about this in:

Seldom Used Tools

Tools that can make a big difference but many developers don’t use them:

Automated static analysis: productivity +21%, quality +31%

Automated unit testing: productivity +17%, quality +24%

Automated unit testing generally involves using test driven development (TDD) or data driven development together with continual build technology.

Automated sizing in function points: productivity +17%, quality +24%

Automated quality and risk prediction: productivity +16%, quality +23%

Automated test coverage analysis: productivity +15%, quality +21%

Automated deployment support: productivity +15%, quality +20%

Automated cyclomatic complexity computation: productivity +15%, quality +20%

Important Techniques with No Tools

There are a number of techniques available in software development that tool vendors have not found a way to monetize on. These techniques tend to be overlooked by most developers, even though they can make a huge difference in productivity and quality.

The Personal Software Process and Team Software Process were developed by Watts Humphrey, one of the pioneers of building quality software.

Personal software process: productivity +21%, quality +31%2

Team software process: productivity +21%, quality +31%3

The importance of inspections is covered in:

Code inspections: productivity +21%, quality +31%4

Requirement inspections: productivity +18%, quality +27%4

Formal test plans: productivity +17%, quality +24%

Function point analysis (IFPUG): productivity +16%, quality +22%

Conclusion

There is definitely a large set of developers that assume that using a tool makes them competent.

The reality is that learning a tool without learning the principles that underly the problem you are solving is like assuming you can beat Michael Jordan at basketball just because you have great running shoes.

Learning tools is not a substitute for learning how do do something competently. Competent developers are continually learning about techniques that lead to higher productivity and quality, whether or not that technique is supported by a tool.

References

VN:F [1.9.22_1171]
Rating: 0.0/5 (0 votes cast)
VN:F [1.9.22_1171]
Rating: 0 (from 0 votes)

The Programmer Productivity Paradox

Programmers seem to be fairly productive people.

You always see them typing at their desks; they chafe for meetings to finish so that they can go back to their desks and code. When asked, they will say that there is not enough time to produce the code, and the sooner they can start coding, the sooner they will be done.

So writing code must be the most important thing, correct?

If the average programmer writes about 50 lines of production code a day.  A 50,000 line program would take 1,000 man days to produce.  The 50,000 line listing can be entered by a programmer at about 1,000 lines a day or about 50 man days.

So what the heck are the developers doing for the other 950 days?

Before addressing that issue, lets make a simple observation. Capers Jones has compared many methodologies (RUP, XP, Agile, Waterfall, etc) and programming languages over thousands of projects and determined that programmers write between 325 and 750 lines of code (LOC) per month, which is less than the 1,000 LOC per month suggested above1.  Even if programmers do not average 50 lines of code per day, the following is clear2.

  • Methodology does not explain the apparent productivity gap
  • No language accounts for the apparent productivity gap

The reality is that only a fraction of a developer’s time is actually spent writing production code. If a developer is typing in code all the time then they are really trying different combinations of code until they finally find the combination of code that works.

Or more correctly, the combination that seems to match the requirements until either QA or the business analyst comes back and lets them know there is a problem.

That is why developers that plan their code before using the keyboard tend to outperform other developers. Not only do only a few developers really plan out their code before coding but also years of experience do not teach developers to learn to plan.  In fact studies over 40 years show that developer productivity does not change with years of experience. (see No Experience Required!)

Years of experience do not lead to higher productivity

Interestingly enough, there are methodologies that have been around for a long time that emphasize planning code.  Watts Humphrey is the created of the Personal Software Process (PSP)3.  Using PSP has been measured to:

PSP can raise productivity by 21.2% and quality by 31.2%

If you are interested there are many other proven methods of raising code quality that are not commonly used (see Not Planning is for Losers).

If your developers at their keyboard and not planning at a white board then odds are that your productivity is not as high as it could be.

Bibliography

1 The The Mythical Man Month is even more pessimistic suggesting that programmers produce 10 production lines of code per day
2 Jones, Capers and Bonsignour, Olivier.  The Economics of Software Quality.  Addison Wesley.  2011
3 Watts, Humphrey.  Introduction to the Personal Software Process, Addison Wesley Longman. 1997

Other articles in the “Loser” series

Want to see more sacred cows get tipped? Check out:

Moo?

Make no mistake, I am the biggest “Loser” of them all.  I believe that I have made every mistake in the book at least once 🙂

VN:F [1.9.22_1171]
Rating: 0.0/5 (0 votes cast)
VN:F [1.9.22_1171]
Rating: 0 (from 0 votes)

Debuggers are Crutches

Woman on CrutchesDefects are common, but they are not not necessary.  They find their way into code because:

Defects are only corrected by understanding pathways and debuggers are not the best way to do this.

Debuggers are commonly used by developer’s to understand a problem, but just because they are common does not make them the best way to find defects.  I’m not advocating a return to “the good old days” but there was a time when we did not have debuggers and we managed to debug programs.

Avoid Defects

Personal Software ProcessThe absolute best way to remove defects is simply not to create them in the first place. You can be skeptical, but things like  the Personal Software Process (PSP) have been used practically to prevent 1 of every 2 defects from getting into your code.  Over thousands of projects:

The Personal Software Process increases productivity by 21% and increases code quality by 31%

A study conducted by NIST in 2002 reports that software bugs cost the U.S. economy $59.5 billion annually. This huge waste could be cut in half if all developers focused on not creating defects in the first place.

Not only does the PSP focus on code planning, it also makes developers aware of how many defects they actually create.  Here are two graphs that show the same group of developers and their defect injection rates before and after PSP training.

Before PSP training After PSP training

Finding Defects

Unskilled professionalUsing a debugger to understand the source of a defect is definitely one way.  But if it is the best way then why do poor developers spend 25 times more time in the debugger than a a good developer? (see No Experience Required!)

That means that poor developers spend a week in the debugger for every 2 hours that good developer does.

No one is saying that debuggers do not have their uses.  However, a debugger is a tool and is only as good as the person using it.  Focus on tools obscures lack of skill (see Agile Tools do NOT make you Agile)

If you are only using a debugger to understand defects then you will be able to remove a maximum of about 85% of all defects, i.e. 1 in 7 defects will always be present in your code.

Orkin manWould it surprise you to learn that their are organizations that achieve 97% defect removal?  Software inspections take the approach of looking for all defects in code and getting rid of them.

Learn more about software inspections and why they work here:

Software inspections increase productivity by 21% and increases code quality by 31%

Even better, people trained in software inspections tend to inject fewer defects into code. When you become adept at parsing code for defects then you become much more aware of how defects get into code in the first place.

But interestingly enough, not only will developers inject fewer defects into code and achieve defect removal rates of up to 97%, in addition:

Every hour spent in code inspections reduces formal QA by 4 hours

Conclusion

As stated above, there are times where a skilled professional will use a debugger correctly.  However, if you are truly interested in being a software professional then:

  • You will learn how to plan and think through code before using the keyboard
  • You will learn and execute software inspections
  • You will learn techniques like PSP which lead to you injecting fewer defects into the code

You are using a debugger as a crutch if it is your primary tool to reduce and remove defects.

Related Articles

Want to see more sacred cows get tipped? Check out:

Make no mistake, I am the biggest “Loser” of them all.  I believe that I have made every mistake in the book at least once 🙂

References

VN:F [1.9.22_1171]
Rating: 2.5/5 (2 votes cast)
VN:F [1.9.22_1171]
Rating: +1 (from 1 vote)

The Programmer Productivity Paradox

Programmers seem to be fairly productive people.  You always see them typing at their desks; they chafe for meetings to finish so that they can go back to their desks and code. When asked, they will say that there is not enough time to produce the code, and the sooner they can start coding, the sooner they will be done.

So writing code must be the most important thing, correct?

If the average programmer writes about 50 lines of production code a day.  A 50,000 line program would take 1,000 man days to produce.  The 50,000 line listing can be entered by a programmer at about 1,000 lines a day or about 50 man days.

So what the heck are the developers doing for the other 950 days?

Before addressing that issue, lets make a simple observation. Capers Jones has compared many methodologies (RUP, XP, Agile, Waterfall, etc) and programming languages over thousands of projects and determined that programmers write between 325 and 750 lines of code (LOC) per month, which is less than the 1,000 LOC per month suggested above1.  Even if programmers do not average 50 lines of code per day, the following is clear2.

  • Methodology does not explain the apparent productivity gap
  • No language accounts for the apparent productivity gap

The reality is that only a fraction of a developer’s time is actually spent writing production code. If a developer is typing in code all the time then they are really trying different combinations of code until they finally find the combination of code that works.  Or more correctly, the combination that seems to match the requirements until either QA or the business analyst comes back and lets them know there is a problem.

That is why developers that plan their code before using the keyboard tend to outperform other developers.  Not only do only a few developers really plan out their code before coding but also years of experience do not teach developers to learn to plan.  In fact studies over 40 years show that developer productivity does not change with years of experience. (see No Experience Required!)

Years of experience do not lead to higher productivity

Interestingly enough, there are methodologies that have been around for a long time that emphasize planning code.  Watts Humphrey is the created of the Personal Software Process (PSP)3.  Using PSP has been measured to:

PSP can raise productivity by 21.2% and quality by 31.2%

If you are interested there are many other proven methods of raising code quality that are not commonly used (see Not Planning is for Losers).

If your developers at their keyboard and not planning at a white board then odds are that your productivity is not as high as it could be.

Bibliography

1 The The Mythical Man Month is even more pessimistic suggesting that programmers produce 10 production lines of code per day
2 Jones, Capers and Bonsignour, Olivier.  The Economics of Software Quality.  Addison Wesley.  2011
3 Watts, Humphrey.  Introduction to the Personal Software Process, Addison Wesley Longman. 1997

Other articles in the “Loser” series

Want to see more sacred cows get tipped? Check out:

Moo?

Make no mistake, I am the biggest “Loser” of them all.  I believe that I have made every mistake in the book at least once 🙂

VN:F [1.9.22_1171]
Rating: 0.0/5 (0 votes cast)
VN:F [1.9.22_1171]
Rating: 0 (from 0 votes)

When BA means B∪<<$#!t Artist

BA typically means Business Analyst, but what makes for a good BA?  When do you have a good BA and when don’t you? Many projects fail at the beginning due to incomplete, inconsistent, and overly verbose analysis produced by BAs.

Are your BAs any good?  The success of many projects depend on the ability of the BA do correctly identify the problem you are trying to solve.  If your BA is not competent then you are doomed before you start.

RubiksCubeBusiness analysis consists of all facets of solving business problems. Business analysis is a role executed by project, product, and engineering managers.  However, there are people that do business analysis as their main role and we simply label them as business analysts or product managers. We shall stick to the term business analyst for simplicity.

Business analysts perform a range of tasks including:

  • Gathering requirements
  • Writing business cases and project charters
  • Performing gap analysis between products and corporate processes

Ever suspect that the people responsible for performing business analysis for you are not up for the challenge?  Here are three simple questions; good business analysts will get all three correct and not take longer than 20 seconds.

  Context Question
#1  MullerLyerLines Which of these two lines is longer?
#2  paris_spring_puzzle What does this sign say?
#3 I have two products whose prices add up to $1.10 and one product is $1 more than the other. How much is the more expensive product?

The answers are:

  1. The lines are the same length
    1. Take a ruler if you are not convinced
  2. Paris in the the spring
    1. Notice that the occurs twice
  3. The more expensive product is $1.05
    1. If the more expensive one had been $1 then the cheaper one would be $0.10 but then the expensive one would only be $0.90 more expensive than the cheaper one.

Jumping+to+conclusionsThese three questions illustrate that the mind can jump to conclusions that are often wrong.  The mind can be tricked because it assesses things quickly and only some people have the instinct to double check their results.

Most BAs are well educated; however, the interesting thing is that studies show that educated people are less able to see their biases and they jump to conclusions more readily than other people.1

A good business analyst realizes that during analysis there will be situations where the mind will jump to conclusions.  Many business analysts are asked to resolve conflicting requirements, recognize missing requirements, and deal with biases coming from many different sources.  Unless you have the reflex of checking facts for consistency and eliminating bias then you won’t make a good business analyst.

So what is the quality of your BAs?

Other articles

Bibliography

West, Richard F. and Meserve, Russel J. Cognitive Sophistication does not Attenuate the Bias Blind Spot. Journal of Personality and Social Psychology.

VN:F [1.9.22_1171]
Rating: 0.0/5 (0 votes cast)
VN:F [1.9.22_1171]
Rating: 0 (from 0 votes)

No Business Case = Failed Project

A business case comes between a bright idea for a software project and the creation o that project. Project Timeline, Business Case

  • To – idea to have a project is born
  • Tcheck – formal or informal business case
  • Tstart – project is initiated
  • Tend – project finishes successfully or is abandoned

Not all ideas for software projects make sense.  In the yellow zone above, between idea and project being initiated, some due diligence on the project idea should occur.  This is where you do the business case, even if only informally on the back of a napkin.

The business case is where you pause and and estimate  whether the project is worth it, i.e. will this project leave you better off than if you did not do it.

For those who want precise definitions the project should be NPV +ve.  In layman’s terms, the project should leave the organization better off on it’s bottom line or at least improve skill levels so that other projects are better off.

Projects that do not improve skills or the bottom line are a failure.

Out of 10 software projects (see Understanding your chances):

  • 3 are successful
  • 4 are challenged, i.e. over cost, over budget, or deliver much less functionality
  • 3 will fail, i.e. abandoned

This means that the base rate of success for any software project is only 3 out of 10.

Yet executives routinely execute projects assuming that they can not fail even though the project team knows that the project will be a failure from day 1.

Business cases give executives a chance to stop dubious projects before they start. (see Stupid is as Stupid Does)

Understanding how formal the business case needs to be comes down to uncertainty. There are three key uncertainties with every project:

  • Requirements uncertainty
  • Technical uncertainty
  • Skills uncertainty

When there is a moderate amount of uncertainty in any of these three areas then a formal business case with cash flows and risks needs to be prepared.

Requirements Uncertainty

Requirements uncertainty is what leads to scope shift (scope creep).  The probability of a project failing is proportional to the number of unknown requirements when the project starts (see Shift Happens).

Requirements uncertainty is only low for two particular projects: 1) re-engineering a project where the requirements do not change, and 2) the next minor version of a software project.

For all other software projects the requirements uncertainty is moderate and a formal business case should be prepared.

Projects new to you have high requirements uncertainty.

Technical Uncertainty

Technical uncertainty exists when it is not clear that all requirements can be implemented using the selected technologies at the level of performance required for the project.

Technical uncertainty is only low when you have a strong understanding of the requirements and the implementation technology. When there is only a moderate understanding of the requirements or the implementation technology then you will encounter the following problems:

  • Requirements that get clarified late in the project that the implementation technology will not support
  • Requirements that can not be implemented once you improve your understanding of the implementation technology

Therefore technical uncertainty is high when you are doing a project for the first time and requirement uncertainty is high.  Technical uncertainty is high when you are using new technologies, i.e. shifting from Java to .NET or changing GUI technology.

Projects with new technologies have moderate to high uncertainty.

Skills Uncertainty

Skills uncertainty comes from using resources that are unfamiliar with the requirements or the implementation technology.  Skills uncertainty is a knowledge problem.

Skills uncertainty is only low when the resources understand the current requirements and implementation technology.

Resources unfamiliar with the requirements will often implement requirements in a suboptimal way when requirements are not well written.  This will involve rework; the worse the requirements are understood the more rework will be necessary.

Resources unfamiliar with the implementation technology will make mistakes choosing implementation methods due to lack of familiarity with the philosophies of the implementation libraries.  Often after a project is complete, resources will understood that different implementation tactics should have been used.

Formal or Informal Business Cases?

An informal business case is possible only if the requirements, technical, and skills uncertainty is low.  This only happens in a few situations:

  • Replacing a system where the requirements will be the same and the implementation technology is well understood by the team
  • The next minor version of a software system

Every other project requires a formal business case that will quantify what kind of uncertainty and what degree of uncertainty exists in the project.  At a minimum project managers facing moderate to high uncertainty should be motivated to push for a business case (see Stupid is as Stupid Does). Here is a list of projects that tend to be accepted without any kind of real business case that quantifies the uncertainties:

  • Change of implementation technology
    • Moving to object-oriented technology if you don’t use it
    • Moving from .NET to Java or vice versa
  • Software projects by non-software companies
  • Using generalists to implement technical solutions
  • Replacing systems with resources unfamiliar with the requirements
    • Often happens with outsourcing

Projects with moderate to high risks and no business case are doomed to fail.

Related articles

VN:F [1.9.22_1171]
Rating: 0.0/5 (0 votes cast)
VN:F [1.9.22_1171]
Rating: 0 (from 0 votes)

What the Heck are Non-Functional Requirements?

What the Heck are Non-Functional Requirements?  Simply put, if functional requirements create code that will address the needs of the end-users (customers), then non-functional requirements address the needs of the people who install, operate, and configure the code.

Those people are the operations personnel and help desk personnel in whatever organization that uses your software.  Every developer needs to be aware of what those non-functional requirements are and why operations personnel and help desk personnel are customers that are just as important as the end-users.

Functional Requirements

Functional requirements are baked into the code that developer’s deliver (interpreted or compiled).   Events from input devices (network, keyboard, devices) trigger functions to convert input into output — all functions have the form:
Function

This is true whether you use an object-oriented language or not.  Non-functional requirements involve everything that surrounds a functional code unit.  Non-functional requirements concern things that involve time, memory, access, and location:

  • Performance
  • Availability
  • Capacity
  • Continuity
  • Security

Non-functional requirements are slightly different between desktop applications and services; this article is focused on non-functional requirements for services.

If you have any knowledge of ITIL you will recognize that the last 4 items deal with the warranty of a service.  In fact, the functional requirements involve the utility of a service, the non-functional requirements involve the warranty of a service.

Availability

Availability is about making sure that a service is available when it is supposed to be available. Availability is about a Configuration Item (CI) in the environment of the operations center that specifies how the code is accessed.  Availability is decided independently of the code and is at best part of the Service Design Package (SDP) that is delivered to the operations department, at worst it is simply code dumped on the operations personnel.

Developer’s need to be aware of the difficulty of creating the CI for the operations personnel.  If a CI is manually created then there will always be a potential for an error when the service is installed or updated.  The requirement to create a CI is a non-functional requirement and the ability to minimize errors is another non-functional requirement.

Developer’s need to be aware of single-points of failure (i.e. services hard-coded to a specific IP) which causes fits in operations that are not running virtual machines (VM) that can have virtual IPs .  The requirement to create code that is not reliant on static IPs or specific machines is a non-functional requirement.  Availability is simplified in operations if the code is resilient enough to allow itself to easily move (or be replicated) among servers.

Availability non-functional requirements include:

  • Ability to easily make the CI
  • Automatic installation of CI or mechanisms
  • Ability to detect and prevent manual errors for a CI
  • Ability to easily move code between servers

Capacity

Capacity is about delivering enough functionality when required.  If you ask a web service to supply 1,000 requests a second when that server is only capable of 100 requests a second then some requests will get dropped.  This may look like an availability issue, but it is caused because you can’t handle the capacity requested.

Internet services almost always can’t provide enough capacity with a single machine and operations personnel need to be able to run multiple servers with the same software to meet capacity requirements.  The ability to run multiple servers without conflicts is a non-functional requirement. The ability to take a failing node and restart it on another machine or VM is a non-functional requirement.

Capacity non-functional requirements include:

  • Ability to run multiple instances of code easily
  • Ability to easily move a running code instance to another server

Continuity

Continuity involves being able to be robust against major interruptions to a service, these include power outages, floods or fires in an operational center, or any other disaster that can disrupt the network or physical machines.

Where availability and capacity often involve redundancy inside a single operation center, continuity involves geographic and network redundancy.  Continuity at best involves having multiple servers that can work in geographically distributed operation centers.  At worst, you need to be able to have a master-slave fail over model with the ability to journal transactions and eventually bring the master back up.

Security

SecurityBouncer, smallSecurity non-functional requirements concern who has access to functions and preventing the integrity of data from being corrupted.

Where access is concerned, how difficult will it be for operations personnel or help desks to set up security for users?  Developer’s build in different levels of access into their applications without considering how difficult it will be for a 3rd party (help desk or operations) to set-up end users.  The ease of setting up security is a non-functional requirement.

Data integrity is another non-functional requirement.  Developer’s need to consider how their applications will behave if the program encounters corrupted data due to machine or network failures.  This is not as important an issue in environments using RAID or redundant databases.

What Happens When You Forget Non-Functional Requirements

Commonly start-ups are so busy setting up their services that the put non-functional requirements on the back burner.  The problem is that there are non-functional requirements that need to be designed into the architecture when software is created.

For example, it is easy to be fooled into building software that is tied to a single machine, however, this will not scale in operations and cause problems later on.  One of the start-ups I was with built a server for processing credit/debit card transactions without considering non-functional requirements (capacity, continuity).  It cost more to add the non-functional requirements than it cost to develop the software!

Every non-functional requirement that is not thought through at the inception of a project will often represent significant work to add later on.  Every such project is a 0 function point project that will require non zero cost!

Generally availability, capacity, and continuity is not a problem for services developed with cloud computing in mind.  However, there are thousands of legacy services that were developed before cloud computing was even possible.

If you are developing a new service then make sure it is cloud enabled!

Operations People are People Too

Make no mistake, operations and help desk personnel are fairly resourceful and have learned how to manage software where non-functional requirements are not handled by the code. Hardware and OS solutions exist for making up for poorly written software that assumes single machines or does not take into account the environment that the code is running in, but that can come at a fairly steep cost in infrastructure.

The world has moved to services and it is no longer possible for developers to ignore the non-functional requirements involved with the code that they are developing.  Developer’s that think through the non-functional requirements can reduce costs dramatically on the bottom line and quality of service being delivered.

The guys that run  operational centers and help desks are customers that are only slightly less important than the end-user.  Early consideration of the non-functional requirements makes their lives easier and makes it much easier to sell your software/services.

It is no longer possible for competent developers to be unaware of non-functional requirements.

Other articles:

  • No Experience Necessary
    • Counter-intuitive evidence why years of experience does not make developers more productive
  • Shift Happens
    • Why scope shift on development projects is inevitable and why not capturing requirements at the start of a project can doom it to failure.
  • Inspections are not Optional
    • Software inspections are intensive but evidence shows that for each hour of inspection you can reduce QA by 4 hours!